

FORAKRIL BLACK is a matt black acrylic water-borne paint for façades. It forms a weather-resistant, water-vapour-permeable coating resistant to ultraviolet radiation. Intended for protective and decorative painting of exterior mineral surfaces of buildings and structures.
For painting new and previously painted exterior concrete, rendered and brick surfaces. Sound old water-borne and alkyd coatings may be maintenance-painted after appropriate preparation and a positive adhesion test.
May be used on suitable cement and cement-lime decorative renders, acrylic decorative renders, sound finish coats of external thermal insulation systems and fibre-cement façade boards, subject to the substrate or system manufacturer's instructions and a mandatory trial application.
Sound old silicate coatings may be repainted only after a mandatory trial application and adhesion test. If adhesion is unsatisfactory after wetting with paint, remove the old silicate coating back to a sound substrate.
Do not apply directly to thermal-insulation boards.
When using a black coating on façade insulation systems, allow for increased solar heating of the surface and the system manufacturer's restrictions on dark shades. If suitability has not been confirmed, the selected solution must be agreed.
| Parameter | Value |
|---|---|
| Colour | Ready black. The product is not tinted. |
| Gloss | matt. |
| Non-volatile matter by mass | 53 ± 3%. |
| Water vapour diffusion-equivalent air layer thickness, Sd | 0.115 m. |
| Dust-dry at +20 °C | approximately 1 hour. |
| Recoating | no earlier than after 2 hours. |
| Approximate coverage per coat | primed substrates – 8–10 m²/l; untreated substrates – 6–8 m²/l; maintenance painting over alkyd enamel – 9–11 m²/l. |
| Recommended total dry-film thickness | 250–300 µm, including the primer-paint and façade-paint coats. |
| Number of coats | normally two. After priming with FORAKRIL PRIMER, one coat is permitted provided that the required hiding power and total dry-film thickness are achieved. |
| Application methods | brush, roller, spray gun or airless spray equipment. |
| Thinner | water. |
| Pack sizes | 0.9; 3.6; 9 l. |
| Shelf life | 36 months. |
| Notes | Actual coverage depends on the texture, absorbency and condition of the substrate and on the application method. A trial application on a prepared area is recommended to determine the quantity required. Drying takes longer at lower temperatures or higher air humidity. Protect the freshly painted surface from rain, dew and other water exposure for 72 hours after applying the final coat. |
The substrate must be sound, dry, clean and suitable for painting. Remove weak and flaking layers, chalking particles, dust, dirt, oils and other contaminants that impair adhesion. Remove mould, moss, algae and other biological contamination; treat with AKVASEPT where necessary.
Eliminate the causes of moisture and efflorescence before work begins. Remove salt deposits. Cleaning without eliminating the source of moisture and salts does not prevent defects from recurring.
Allow fresh concrete to cure for at least 28 days and render for 7–28 days, depending on its composition. Follow the curing and painting-preparation periods and conditions specified by the manufacturer of the concrete, render or repair compound.
This period does not apply to industrial manufacture of reinforced-concrete components that are subsequently painted in the factory. In such cases, use of FORAKRIL BLACK requires RILAK technical support and an individually selected application method taking account of the concrete composition, drying and curing conditions and equipment used.
Before painting, the substrate must be sufficiently dry and cured. Surface dryness alone is not sufficient: ongoing curing processes and high substrate alkalinity may cause efflorescence, colour changes and damage to subsequent coating layers.
Check the soundness and adhesion of the old coating. Remove poorly bonded and flaking areas back to a sound substrate. Thoroughly remove contamination and chalking particles and allow the cleaned surface to dry.
Abrade sound smooth and glossy coatings, including old alkyd enamels, to improve adhesion, then remove dust. Before painting the entire surface, make a trial application of FORAKRIL BLACK and check intercoat adhesion after drying.
Identify and, where possible, eliminate the causes of moisture and infestation. Wash the surface thoroughly. On exterior surfaces, use high-pressure washing, selecting a pressure that will not damage the substrate or a sound old coating.
Prepare the AKVASEPT working solution by mixing one part by volume of concentrate with two parts of water. Apply the first coat with a stiff brush when the air and surface temperature is at least +10 °C. Inspect the surface after drying. If contamination remains, wash again and allow to dry, then apply a second coat of AKVASEPT working solution. Do not prime or paint until at least 48 hours after the second treatment and the substrate has dried.
For strengthening slightly chalking, porous and absorbent mineral substrates and equalising their absorbency. Apply in accordance with the product TDS, avoiding formation of an unabsorbed glossy film.
For improving adhesion, reducing finish-paint consumption and increasing the coating system's water-repellent properties. Use FORAKRIL BASE first on particularly porous substrates. One coat of FORAKRIL BLACK may be applied after priming with FORAKRIL PRIMER. Apply an additional coat if hiding power or total dry-film thickness is insufficient.
On a sound, prepared mineral substrate of uniform absorbency, the first coat of FORAKRIL BLACK may serve as a priming coat. For brush or roller application, dilute with 3–8% water by volume. This does not replace prior strengthening of a weak, chalking or highly absorbent substrate with a suitable primer.
Stir the paint thoroughly until homogeneous before use. For the first coat by brush or roller, add 3–8% clean water by volume if necessary. The finish coat should preferably be applied undiluted.
For airless spraying, the paint may be diluted with no more than 5% water by volume if necessary, including for the first coat. For air spraying, add the minimum amount of water required to reach the working viscosity of the equipment used. Do not over-dilute or add water unnecessarily.
Air and surface temperature: +5 to +30 °C. Relative air humidity: no more than 85%. Optimum conditions: +15 to +25 °C and 50–60% relative air humidity.
Do not paint a damp, frozen or overheated substrate. Do not work in rain, fog, dew, strong wind or direct sunlight. Plan the work so that the coating is not exposed to rain, dew or other water for 72 hours after applying the final coat.
Apply evenly by brush, roller, spray gun or airless spray equipment. Normally apply two coats. After priming with FORAKRIL PRIMER, one coat is permitted provided that the required hiding power and total dry-film thickness of 250–300 µm are achieved.
Paint one continuous plane without interruption, joining adjacent areas while the edge is still wet. Apply the next coat no earlier than after 2 hours at +20 °C, after confirming that the previous coat has dried sufficiently.
Wash tools with soap and water immediately after use.
Store in the manufacturer's unopened, tightly closed container above +5 °C. Protect from freezing. Shelf life: 36 months.
Follow the current label and safety data sheet. Ensure adequate ventilation and use the personal protective equipment required for the application method and working conditions. Do not allow product residues to enter drains, bodies of water or soil. Detailed information is provided in the current SDS, available on request.
FORAKRIL BLACK is a matt black acrylic water-borne paint for façades. It forms a weather-resistant, water-vapour-permeable coating resistant to ultraviolet radiation. Intended for protective and decorative painting of exterior mineral surfaces of buildings and structures.
For painting new and previously painted exterior concrete, rendered and brick surfaces. Sound old water-borne and alkyd coatings may be maintenance-painted after appropriate preparation and a positive adhesion test.
May be used on suitable cement and cement-lime decorative renders, acrylic decorative renders, sound finish coats of external thermal insulation systems and fibre-cement façade boards, subject to the substrate or system manufacturer's instructions and a mandatory trial application.
Sound old silicate coatings may be repainted only after a mandatory trial application and adhesion test. If adhesion is unsatisfactory after wetting with paint, remove the old silicate coating back to a sound substrate.
Do not apply directly to thermal-insulation boards.
When using a black coating on façade insulation systems, allow for increased solar heating of the surface and the system manufacturer's restrictions on dark shades. If suitability has not been confirmed, the selected solution must be agreed.
| Parameter | Value |
|---|---|
| Colour | Ready black. The product is not tinted. |
| Gloss | matt. |
| Non-volatile matter by mass | 53 ± 3%. |
| Water vapour diffusion-equivalent air layer thickness, Sd | 0.115 m. |
| Dust-dry at +20 °C | approximately 1 hour. |
| Recoating | no earlier than after 2 hours. |
| Approximate coverage per coat | primed substrates – 8–10 m²/l; untreated substrates – 6–8 m²/l; maintenance painting over alkyd enamel – 9–11 m²/l. |
| Recommended total dry-film thickness | 250–300 µm, including the primer-paint and façade-paint coats. |
| Number of coats | normally two. After priming with FORAKRIL PRIMER, one coat is permitted provided that the required hiding power and total dry-film thickness are achieved. |
| Application methods | brush, roller, spray gun or airless spray equipment. |
| Thinner | water. |
| Pack sizes | 0.9; 3.6; 9 l. |
| Shelf life | 36 months. |
| Notes | Actual coverage depends on the texture, absorbency and condition of the substrate and on the application method. A trial application on a prepared area is recommended to determine the quantity required. Drying takes longer at lower temperatures or higher air humidity. Protect the freshly painted surface from rain, dew and other water exposure for 72 hours after applying the final coat. |
The substrate must be sound, dry, clean and suitable for painting. Remove weak and flaking layers, chalking particles, dust, dirt, oils and other contaminants that impair adhesion. Remove mould, moss, algae and other biological contamination; treat with AKVASEPT where necessary.
Eliminate the causes of moisture and efflorescence before work begins. Remove salt deposits. Cleaning without eliminating the source of moisture and salts does not prevent defects from recurring.
Allow fresh concrete to cure for at least 28 days and render for 7–28 days, depending on its composition. Follow the curing and painting-preparation periods and conditions specified by the manufacturer of the concrete, render or repair compound.
This period does not apply to industrial manufacture of reinforced-concrete components that are subsequently painted in the factory. In such cases, use of FORAKRIL BLACK requires RILAK technical support and an individually selected application method taking account of the concrete composition, drying and curing conditions and equipment used.
Before painting, the substrate must be sufficiently dry and cured. Surface dryness alone is not sufficient: ongoing curing processes and high substrate alkalinity may cause efflorescence, colour changes and damage to subsequent coating layers.
Check the soundness and adhesion of the old coating. Remove poorly bonded and flaking areas back to a sound substrate. Thoroughly remove contamination and chalking particles and allow the cleaned surface to dry.
Abrade sound smooth and glossy coatings, including old alkyd enamels, to improve adhesion, then remove dust. Before painting the entire surface, make a trial application of FORAKRIL BLACK and check intercoat adhesion after drying.
Identify and, where possible, eliminate the causes of moisture and infestation. Wash the surface thoroughly. On exterior surfaces, use high-pressure washing, selecting a pressure that will not damage the substrate or a sound old coating.
Prepare the AKVASEPT working solution by mixing one part by volume of concentrate with two parts of water. Apply the first coat with a stiff brush when the air and surface temperature is at least +10 °C. Inspect the surface after drying. If contamination remains, wash again and allow to dry, then apply a second coat of AKVASEPT working solution. Do not prime or paint until at least 48 hours after the second treatment and the substrate has dried.
For strengthening slightly chalking, porous and absorbent mineral substrates and equalising their absorbency. Apply in accordance with the product TDS, avoiding formation of an unabsorbed glossy film.
For improving adhesion, reducing finish-paint consumption and increasing the coating system's water-repellent properties. Use FORAKRIL BASE first on particularly porous substrates. One coat of FORAKRIL BLACK may be applied after priming with FORAKRIL PRIMER. Apply an additional coat if hiding power or total dry-film thickness is insufficient.
On a sound, prepared mineral substrate of uniform absorbency, the first coat of FORAKRIL BLACK may serve as a priming coat. For brush or roller application, dilute with 3–8% water by volume. This does not replace prior strengthening of a weak, chalking or highly absorbent substrate with a suitable primer.
Stir the paint thoroughly until homogeneous before use. For the first coat by brush or roller, add 3–8% clean water by volume if necessary. The finish coat should preferably be applied undiluted.
For airless spraying, the paint may be diluted with no more than 5% water by volume if necessary, including for the first coat. For air spraying, add the minimum amount of water required to reach the working viscosity of the equipment used. Do not over-dilute or add water unnecessarily.
Air and surface temperature: +5 to +30 °C. Relative air humidity: no more than 85%. Optimum conditions: +15 to +25 °C and 50–60% relative air humidity.
Do not paint a damp, frozen or overheated substrate. Do not work in rain, fog, dew, strong wind or direct sunlight. Plan the work so that the coating is not exposed to rain, dew or other water for 72 hours after applying the final coat.
Apply evenly by brush, roller, spray gun or airless spray equipment. Normally apply two coats. After priming with FORAKRIL PRIMER, one coat is permitted provided that the required hiding power and total dry-film thickness of 250–300 µm are achieved.
Paint one continuous plane without interruption, joining adjacent areas while the edge is still wet. Apply the next coat no earlier than after 2 hours at +20 °C, after confirming that the previous coat has dried sufficiently.
Wash tools with soap and water immediately after use.
Store in the manufacturer's unopened, tightly closed container above +5 °C. Protect from freezing. Shelf life: 36 months.
Follow the current label and safety data sheet. Ensure adequate ventilation and use the personal protective equipment required for the application method and working conditions. Do not allow product residues to enter drains, bodies of water or soil. Detailed information is provided in the current SDS, available on request.
Find out how much of the product You will need.
Daugavgrīvas iela 63/65, Rīga, LV-1007
Reģistrācijas Nr.: 40003284444
PVN Nr.: LV40003284444
Banka: A/S Swedbank
Konts: LV23HABA0019308047593
Bankas kods: HABALV22